A Kelder house where natural oak floors, sculptural lighting and soft textures connect the kitchen, dining and living areas into one calm flow. Warm light, clean lines and quiet balance were the brief, and every material was chosen to hold that balance through the day.
A full gut renovation in the old quarter runs about ten to twelve months from the first design to the final walkthrough (Corniel Construction, 2026); a the river district house without structural work is shorter. Call before the architect's drawings are final: the storage, the kitchen and the lighting are cheapest to move on paper.
Halcyon comes to the home or the plans with a tape measure and questions: how you live, what must stay, what the budget is and what the art needs. You leave with a first reading of what can move and a proposal for the scope and the fee follows within a week.